About the project
A sports facility completed with a 2.216 m² footprint and 8.288 m² total construction area. It opened in 2010 with a semi-Olympic swimming pool, fitness areas, Turkish bath, sauna, and cafe units.
Construction of the Esenyurt Indoor Swimming Pool began in 2008. It is a sports facility project completed with a 2.216 m² footprint and a total construction area of 8.288 m². Consisting of 2 basement floors, a ground floor, and 3 typical floors, the building was planned to meet indoor sports and social-use needs.
The project includes a semi-Olympic swimming pool, fitness centers, Turkish bath, sauna, and cafe areas. Combining sports, relaxation, and social-use functions within the same structure, the facility opened for service in 2010.
Scope
8.288 m² construction areaSemi-Olympic swimming poolFitness, Turkish bath, sauna, and cafe